Project involved bulk earthworks and waterway construction on the previous Maroochydore Golf Course site, in preparation for the construction of the new Maroochydore CBD.
Works included the construction of a diversion drain, clearing and grubbing, demolition of properties in Maud Street, topsoil stripping, bulk earthworks, installation of new 11kV infrastructure conduits, removal of existing service conduits, excavation of a new waterway and the filling of future roadways.


• Live sewer interfacing with existing infrastructure
• Over $800k of variation works were required on this project, mainly associated with the interfacing of the sewer prior to the underground HV power going through
• Construction of a large custom designed and built 3m diameter sewer manhole >4m deep around an existing live 675mm dia sewer pipe. The use of specially designed support structures and large sheet piling to carry out these works
• Construction of a diversion drain to allow a tidal creek to maintain flow during construction of the new channel for the future city centre