SCOPE OF WORKS

Project involved bulk earthworks and waterway construction on the previous Maroochydore Golf Course site, in preparation for the construction of the new Maroochydore CBD.
Works included the construction of a diversion drain, clearing and grubbing, demolition of properties in Maud Street, topsoil stripping, bulk earthworks, installation of new 11kV infrastructure conduits, removal of existing service conduits, excavation of a new waterway and the filling of future roadways.

SITE SPECIFIC REQUIREMENTS

• Live sewer interfacing with existing infrastructure
• Over $800k of variation works were required on this project, mainly associated with the interfacing of the sewer prior to the underground HV power going through
• Construction of a large custom designed and built 3m diameter sewer manhole >4m deep around an existing live 675mm dia sewer pipe. The use of specially designed support structures and large sheet piling to carry out these works
• Construction of a diversion drain to allow a tidal creek to maintain flow during construction of the new channel for the future city centre