SCOPE OF WORKS

Residential subdivision including:
• 1406m3 of excess topsoil exported offsite
• 5000m3 cut to fill
• 1403m2 of 25mm asphaltic concrete
• 1760m2 of 50mm asphaltic concrete
• 240m2 concrete sleeper retaining walls
• 530m of RC stormwater pipe (ranging from 300mm dia to 1200mm dia) and large manhole structures
• 1 x bioretention basin
• 853m PE sewer
• 442m PE water
• Electrical works including conduits and PMT site

Download As PDF